• Phone

    0086-0574-88121539

  • Address

    2301, No. 666, Jinyu Road, Yinzhou District, Ningbo, Zhejiang, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            OD 847011 5 pcs paint work kit wallpaper cleaning work tool

                            OD 847011 5 pcs paint work kit wallpaper cleaning work tool

                            OD 847011 5 pcs paint work kit wallpaper cleaning work tool

OD 847011 5 pcs paint work kit wallpaper cleaning work tool

Od 847011 5 Pcs Paint Work Kit Wallpaper Cleaning Work Tool, High Quality Wallpaper Cleaning Tool,Wallpaper Work Set,Wallpaper Kit
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
OEM
Model Number:
OD-847011
Feature:
Eco-Friendly
product name:
wallpaper cleaning tool
Material:
PP,ABS,stainless steel
color:
customized
size:
Available
function:
cleaning
5 pcs set of:
stripping knife, seam roller, brush,wallpaper trimming knife, scissor
Packaging & Delivery
Packaging Details
package of OD 847011 5 pcs paint work kit wallpaper cleaning work tool : double blister to a carton
Delivery Time
30-40days
Product Description
Product Description
Product nameOD 847011   5 pcs paint work kit wallpaper cleaning work tool 
MaterialPP,ABS,STAINLESS STEEL 
Description

Content of set: :
1 x stripping knife 3"
length 20.5cm, material of handle: PP
1 x seam roller, length 18cm
material: PP, dia roller: 4.5cm
1 x paper hanging brush 7", length: 17cm
material: PP, length of brushes: 4cm, white
1 x wallpaper trimming knife(small knife)
1 x scissors 10", thickness 2mm
material: handle ABS, blade stainless steel

Packingdouble blister
Product N.W0.425kgs
Pcs/ctn20pcs
CTN/Size70*34*24cm
UsageOD 847011   5 pcs paint work kit wallpaper cleaning work tool 

 OD 847011 5 pcs paint work kit wallpaper cleaning work toolOD 847011 5 pcs paint work kit wallpaper cleaning work tool

Packaging & Shipping

1.Packaging

QTY/CTNN.WG.WCBM
 20pcs8.5kgs 9.5kgs 0.058m³

 

 

2.Shipping

 

OD 847011 5 pcs paint work kit wallpaper cleaning work tool

 

 

3.Payment terms

T/T,L/C,Western Union,Paypal.

Our Services

OD 847011 5 pcs paint work kit wallpaper cleaning work tool

 

 

Company Information

                           WHY CHOOSE US?

--- Ningbo Oden Imp & Exp Co.,Ltd located in Ningbo city, Zhejiang Province.

 

--- We supply a wider range of hand tools, garden tools, hardware, auto accessories products and always keep on design and develop new products for worldwide customers,


--- We highly focus on product quality , our products is well controlled not only from raw material and in-site inspection,

 

--- We had all test done by 3rd party at home and aboard, to ensure we deliver products that comply with very latest standards in quality and safe.

 

--- Today we had created and supplied app 10000 items to worldwide customers. We love our business, we hope with our professional team work we can service more business partners .

 

OD 847011 5 pcs paint work kit wallpaper cleaning work tool 

FAQ

1) When can i get the price?

   we usually quote within 24 hours after we get your inquiry.

     if you are very unrgent to get the price,please call us or tell us in your email            

     sothat we will  regard your inquiry priority.

 

2) How can i get a sample to check your quality?

 

   After price /confirm/iation,you can require for samples to check our quality.

   if you just need a blank sample to check the design and paper qulity.

   we will provide you sample for free,as long as you afford the express freight.

 

3) How long can i expect to get the sample?

 

  After you pay the sample charge and send us /confirm/iedfiles,the samples will be ready for  delivery 3-7 days.The samples will be sent yo you via express and arrive in 3-5 worksdays.You  can use youe express account or prepay us if you do not have an account.

 

4) How long does the whole prcedure being worked out?

 

   After you place the order ,the production handling times is about 25-45 days .we need 15 days    to prepared all the stuff then 30 days for manyfacting.

 

5) What about the transportation and delivery date?

 

  Normally we use shipment to transport the goods It is about 25-45 days.It also depends on        which coutry and port you are. It could be shorter if you need to send the goods like Asian.

  If there are some emergencies we can send the goods via air express,as long as you afford the     traffic expense.